Industrial construction

Companies are a world unto themselves, with their own laws keeping their production in a perfect flow. And this doesn't change with a new building. Operations have to continue, oftentimes right next to the construction site. Usually the start of production in the new building is already determined before construction even begins.

The planning teams at COPLAN know exactly what that entails.

At the same time, we are flexible even during the realization and are able to immediately and professionally implement changes becoming necessary during the construction phase. We are with you every step of the way and make sure that all standards are met – from immission control to fire protection to the applicable guidelines for workplaces.

 

References

Structural planning, operating units, workshops, halls     mehr Info...
Development and measurement center MANN+HUMMEL, Marklkofen     mehr Info...

Contractor: MANN+HUMMEL GmbH
Measure: New construction

The new development and measurement center strengthens the product development activities in Marklkofen and establishes the center as a competence center for automotive filters. An important step towards more independence, flexibility and speed.

Trades and work phases:
  • Construction planning: WPH 5 – 8
Logistics and production halls AUDI AG, Györ (Hungary)     mehr Info...

Contractor: AUDI AG Ingolstadt
Measure: New construction

Five new halls were constructed at the production site in Györ, Hungary, to increase production. This included the creation of space for a logistics center, street/rails for handling three complete trains and 200 trucks every day, a finish hall, a temporary construction, meeting rooms, office units, a production hall as well as an area for external service providers.

Trades and work phases:
  • Construction planning: WPH 5 – 8
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
MANN + HUMMEL Marklkofen     mehr Info...

Contractor: MANN+HUMMEL GmbH
Measure: New construction and quality assurance

Three new halls were constructed to increase production. This included the construction of areas for high bay storage, incoming goods, intermediate storage, logistics, production, development, testing as well as staff rooms. Additionally, the quality standards were checked and secured.

Trades and work phases:
  • Construction planning: WPH 8 – 9
  • Electrical engineering: WPH 8 – 9
  • Building services engineering: WPH 8 – 9
Plant SGF Waldkraiburg     mehr Info...

Contractor: SGF Waldkraiburg
Measure: Extension and new construction

The extension of the existing plant comprises several new constructions in the northwestern and north-eastern part of the premise as well as the addition of an extra floor to parts of the staff building and conversion of the existing production. Additionally, a bridge linking to the new extension was built for increased production. The works in the existing production hall comprise the construction of new partitions and ceilings corresponding to the defined new room structure.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
Roggermaier GmbH Augsburg     mehr Info...

Contractor: Roggermaier GmbH
Measure: New construction

The planned complex essentially consists of three elements, administration, assembly hall and uninsulated hall, that are linked together by a roofed passage. The complex is heated and cooled by a ground water heat pump. The administration has two floors. In addition to the office rooms it offers space for a reception and waiting area, company apartments, training and break rooms as well as building service engineering. The assembly hall has been planned for five axis with an attached roofed washing station and a passage.

Trades and work phases:
  • Construction planning: WPH 1 – 8
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 8
  • Building services engineering: WPH 1 – 8
  • Outdoor installations: WPH 1 – 8
  • Surveying
Truck & Bus service station MAN, Frechen     mehr Info...

Contractor: MAN Truck & Bus Deutschland GmbH
Measure: New construction

The service stations all across Europe are based on a modular concept and have been adapted to the conditions on site, for example, as far as the number of repair stations, size and orientation of the administration and the warehouse are concerned. The Frechen site has the following spatial organization: Administrative and entrance area, office and staff rooms, repairs reception, repair stations with pits, repair/servicing, engine and brake testing, logistics/warehouse, washing facilities, dialogue and diagnosis hall, cab repair works, hazardous materials warehouse, oil management and sometimes painting lines.

Trades and work phases:
  • Construction planning: WPH 1 – 8
  • Structural planning: WPH 1 – 3
  • Electrical engineering: WPH 1 – 8
  • Building services engineering: WPH 1 – 8
  • Outdoor installations: WPH 1 – 8
  • Complete water supply and drainage systems
BMW Brilliance Automotive China     mehr Info...

Contractor: BMW Brilliance Automotive
Measure: New construction

New construction of a paint shop for 30 uph (units per hour) on the premises in Shenyang, Tiexi. A later extension to 60 uph is possible and was considered in the draft. The design keeps Chinese production methods in mind and no complicated special solutions were used. The firm, generous grid and the far reaching static realization allow a flexible use or free conversion of the production later on during operation.

Trades and work phases:
  • Construction planning: WPH 1 – 3
  • Structural planning: WPH 1 – 3
  • Electrical engineering: WPH 1 – 3
  • Building services engineering: WPH 1 – 3
Plant BMW Dingolfing, production hall Unterhollerau     mehr Info...

Contractor: BMW AG Dingolfing
Measure: Conversion

The existing logistics halls were converted into production halls for the construction of the car body of a new model. Four buildings were gutted and equipped with new mechanical equipment rooms, group and staff rooms, the interior of the administrative areas was modernized and the washing, changing and sanitary facilities were newly equipped and extended and a cafeteria with room for 60 people was created.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Electrical and communications engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Water management: WPH 1 – 9
  • Surveying
 
Roggermaier GmbH Aschheim     mehr Info...

Contractor: Roggermaier GmbH
Measure: New construction

The building essentially consists of three elements, administration, assembly hall and uninsulated hall, that are linked together by canopies. The administration has five floors. In addition to the office rooms it offers space for a reception and waiting area, company apartments, training and break rooms as well as building service engineering. The twofloor assembly hall has been planned for ten axis with an attached roofed washing station and a passage.

Trades and work phases:
  • Construction planning: WPH 1 – 8
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 8
  • Building services engineering: WPH 1 – 8
  • Outdoor installations: WPH 1 – 8
  • Surveying
Bus station München Ost     mehr Info...

Contractor: Stadtwerke München GmbH
Measure: General renovation

The bus station comprises two assembly halls, four garages as well as an adjoining staff area. The renovation of the entire station was carried out while operation continued, however, the entire building and assembly hall equipment was dismantled. After the comprehensive concrete renovation of all structural components such as pillars, girders, ceilings and roof construction, the building equipment, assembly hall equipment and media technology were newly installed, including wash station, paint shop, gas station and break testing

Trades and work phases:
  • Construction planning: WPH 3 – 9
Car dealer Opel Solcher Eggenfelden     mehr Info...

Contractor: Opel Solcher e. K. Pfarrkirchen
Measure: New construction

The new building of Opel Solcher e. K. is divided into the assembly hall with attached office and staff rooms as well as an exhibition area. The roof areas are built as lean-to roofs, the structure is built on a raft foundation and the main structural elements of the external walls are steel constructions. The facades are coffered walls or sandwich panels with transom and mullion elements.

Trades and work phases:
  • Construction planning: WPH 3 (only proportional), 5 – 9
  • Structural planning: WPH 1 – 6
  • Supply facilities and outdoor installations: WPH 1 – 9
  • Surveying