General planning

The bigger the project, the more you have to talk about. We are a reliable partner and the one contact for your entire project, from planning to realization.

Make use of the advantages of general planning for your overall project management as well as for certain groups of crafts such as building construction and design, building management systems and the development of housing estates – all tailored to your needs.

Subcontractors are not necessary in this process, as we have both the necessary capacities and the corresponding competencies in our own company.
 

References

General planning     mehr Info...
COPLAN AG Headquarters, Eggenfelden     mehr Info...

Contractor: COPLAN AG
Measure: New construction and renovation

The new construction of the headquarters in Hofmark Gern in Eggenfelden was realized within an ensemble landmarked with regard to urban design and monument preservation. The barn registered as stand alone monument was renovated in accordance with its status as monument, converted into a modern office building and extended. The building was planned and realized as a sustainable building and was awarded the certification gold by the German Sustainable Building Council (DGNB). In September 2014 the building project received the Bavarian Award for Preservation of Monuments in bronze.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
  • Surveying
  • Safety and health coordination (SiGeKo)
Stadtplatz Eggenfelden     mehr Info...

Contractor: Eggenfelden
Measure: Renovation

The renovation of the square Stadtplatz is the most important phase of the renovation of the entire city center of Eggenfelden. Some phases are already finished (e.g. Carcassonner Platz, Fischbrunnenplatz, ...) and after long and thorough discussions on the development of the traffic, park and recreational areas, the construction work started in April 2011. The utility and supply lines were checked and renewed, if necessary, in advance. For the whole square, high quality pavement is used in a way that corresponds to the heavy traffic and the design requirements.

Trades and work phases:
  • Outdoor installations: WPH: 5 – 9
  • Local construction supervision
  • Traffic facilities: WPH 5 – 9
  • Civil engineering works: WPH 1 – 9
  • Electrical engineering: WPH 1 – 9
  • Draft survey
  • Building survey
Grund- und Hauptschule Garching bei München (elementary and lower secondary school) Garching near Munich     mehr Info...

Contractor: Garching near Munich
Measure: General renovation and extension

The work on the elementary and lower secondary school were carried out in two phases. In the first phase two halls of classrooms, incl. administration, teachers’ lounge, specialist rooms and the gym, were completely renovated. In the second phase an extension was added to include facilities for after school care and a day nursery.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
  • Surveying
BRK retirement home Simbach am Inn     mehr Info...

Contractor: Bavarian Red Cross, district chapter Rottal-Inn
Measure: Extension and renovation

A new assistance and care concept that enables demented patients to practice their everyday activities and habits required the conversion of the building built in the 1980s. The building project included an extension added to the west wing of the building complex, the redesigning of the main entrance, the conversion of the room design in the existing building and the extension of the top floor by dormers. The driveway to the basement was rerouted.

Trades and work phases:
  • Construction planning: WPH 7 – 9
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Furnishing, outdoor installations: WPH 7 – 9
Roggermaier GmbH Aschheim     mehr Info...

Contractor: Roggermaier GmbH
Measure: New construction

The building essentially consists of three elements, administration, assembly hall and uninsulated hall, that are linked together by canopies. The administration has five floors. In addition to the office rooms it offers space for a reception and waiting area, company apartments, training and break rooms as well as building service engineering. The twofloor assembly hall has been planned for ten axis with an attached roofed washing station and a passage.

Trades and work phases:
  • Construction planning: WPH 1 – 8
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 8
  • Building services engineering: WPH 1 – 8
  • Outdoor installations: WPH 1 – 8
  • Surveying
SGF Werk Waldkraiburg     mehr Info...

Contractor: SGF Waldkraiburg
Measure: Extension and new construction

The extension of the existing plant comprises several new constructions in the northwestern and north-eastern part of the premise as well as the addition of an extra floor to parts of the staff building and conversion of the existing production. Additionally, a bridge linking to the new extension was built for increased production. The works in the existing production hall comprise the construction of new partitions and ceilings corresponding to the defined new room structure.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9