Public buildings

Everyone entering a public building should feel immediately welcome. It's the details that make the difference. We are your one-source partner who keeps an eye on all the factors, controls all processes centrally and has competent teams ready for every task.

This begins already during the planning phase. We moderate this process for you, coordinate all the parties involved and ensure that both deadlines and budgets are met. We make sure that your project receives all available financial support and is always on a safe legal and procedural basis.

Proud public buildings radiate into their surroundings and enrich any location. They have their own personality, yet fit in.

 

References

Day nurseries     mehr Info...
Day nursery Taufkirchen     mehr Info...

Contractor: Taufkirchen near Munich
Measure: New construction

The modern building with an unique colour design will have a day nursery for 50 children on the first floor. On the upper floor there will be room for 75 children in after school care as well as a family center and a second hand shop.

Trades and work phases:
  • Construction planning: WPH 1 – 9
Day nursery Kirchenstraße, Munich     mehr Info...

Contractor: Building Department Munich
Measure: New construction

The day nursery is an additional part of the elementary and special-needs school that has been extended by a gym and a cafeteria as well as a “Pre-school group”. The works as well as the measure took place as well as the demolition of the existing buildings were carried out during operation.

Trades and work phases:
  • Construction planning: WPH 6 – 9
Schools     mehr Info...
Karl-von-Closen Gymnasium (academic secondary school), Eggenfelden     mehr Info...

Contractor: District Rottal-Inn
Measure: General renovation, new construction extension building

In the course of the general renovation of the Karl-von-Closen Gymnasium in Eggenfelden the specialist rooms were grouped together. This provided a structural improvement of the teaching. The two schoolyards, the teachers’ parking lot and the roofed bicycle stands as well as the existing green areas were remodelled. All measures were carried out while the buildings were in use.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
  • Surveying
Musikschule Eggenfelden (music school), Schlossökonomie Gern     mehr Info...

Contractor: Eggenfelden
Measure: General renovation including gutting

The landmarked building with its historic building fabric was gutted completely except for its facade and modernized for a new purpose. This created a multi-purpose room on the 2nd floor with elegant steel constructions as well as an acoustically effective ceiling for musical presentations.

Trades and work phases:
  • Construction planning: WPH 5 – 8
  • Electrical engineering: WPH 1 – 9
  • Elevator, material handling and storage technology: WPH 1 – 9
  • Safety and health coordination (SiGeKo)
Berufschule Dingolfing (vocational school), Dingolfing     mehr Info...

Contractor: District Dingolfing-Landau
Measure: New construction

New construction of the Berufschule Dingolfing for electrical engineering, automotive mechatronics engineering, car body construction, vehicle electrics and metal technology. In addition to the basic facilities such as an auditorium and a cafeteria, normal classrooms alternate with specialist rooms and each wing is dedicated to a specific department to ensure optimum education.

Trades and work phases:
  • Electrical engineering: WPH 1 – 9
Betty-Greif Schule (special-needs school), Pfarrkirchen     mehr Info...

Contractor: District Rottal-Inn
Measure: Extension, conversion and renovation

The Betty-Greif Schule from 1982 is completely renovated and extended to a capacity of 150 students. The 450 m2 new extension building is a lightweight wood framing that is built on the existing north wing. This creates a spatial enclosure of the schoolyard and a newly roofed playground. The accessibility of the building and the outdoor sports facilities for handicapped is improved and the drop-off and pick-up area for students is optimized. To allow lessons to continue, the wood framing for the new construction was delivered ready-made. The contractor wanted a sustainable school building. Therefore, only ecologically valuable material was used, especially derived timber products were widely used.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
  • Surveying
Grund- und Mittelschule Dorfen (Elementary and middle school), Dorfen     mehr Info...

Client: City of Dorfen
Measure: Complete renovation and new construction

In the first construction phase of the 40-year-old building complex, the interior of the elementary school including the assembly hall was renovated and a cafeteria and catering kitchen built. In the second construction phase, the entire middle school, including the gym, was completely renovated. The renovation took place while classes were in session; the pupils of the building part being renovated were moved to containers.

Trades and work phases:
  • Building planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Building engineering: WPH 1 – 9

Winner of the FASSADENPREIS 2016 prize of the administrative district of Erding
The „Kreisverein für Heimatschutz und Denkmalpflege Landkreis Erding e.V.” association for the fostering of regional values and traditions and the protection and preservation of historic monuments of the administrative district of Erding has been awarding a façade prize for particularly well-done new buildings and renovation or conversion measures since 1986. One condition is that the appearance of the building with regard to the design of the façade, materials used, quality and technique of the realization, or coloration maintains, supplements, or enriches the appearance of the town in an exemplary manner. Our design of the complete renovation and new construction of the elementary and middle school of Dorfen was able to convince the jury in all points and was awarded the façade prize in 2016.

Grund- und Hauptschule Garching bei München (elementary and lower secondary school) Garching near Munich     mehr Info...

Contractor: Garching near Munich
Measure: General renovation and extension

The work on the elementary and lower secondary school were carried out in two phases. In the first phase two halls of classrooms, incl. administration, teachers’ lounge, specialist rooms and the gym, were completely renovated. In the second phase an extension was added to include facilities for after school care and a day nursery.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
  • Surveying
Haupt- und Realschule Arnstorf (lower and intermediate secondary school), Arnstorf     mehr Info...

Contractor: Arnstorf
Measure: New construction and general renovation

This construction project included the renovation of numerous classrooms and the addition of further rooms by building another floor. Furthermore, a new three-court gym and a cafeteria were built. All measures were carried out while the building was in use.

Trades and work phases:
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
Realschule Taufkirchen (intermediate secondary school), Taufkirchen     mehr Info...

Contractor: Special Purpose Association Public Intermediate Secondary School Taufkirchen
Measure: New construction

The new construction of the Realschule Taufkirchen with 5 classes per year was designed as elongated building with four floors and two patios. Besides classrooms and specialist rooms a “cluster” with 6 classrooms each was integrated into the building. The heart of the school are the three floors high recess hall with lounge on the first floor and the galleries on the 2nd and 3rd floor as well as the main staircase.

Trades and work phases:
  • Electrical engineering: WPH 2 – 9
Grundschule Geisenhausen (elementary school), Geisenhausen     mehr Info...

Contractor: Geisenhausen
Measure: Energy efficiency and general renovation

General renovation of the school building with partly historic building fabric. The elementary school has 13 classrooms for approx. 300 students as well as administrative and specialised rooms, after school care facilities, a day nursery and a library. All building measures such as fire prevention, modernization of all rooms, renovation of the building envelope for energy efficiency and energy efficiency measures were carried out while the buildings were in use.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9
  • Safety and health coordination (SiGeKo)
Realschule Feucht (intermediate secondary school), Feucht     mehr Info...

Contractor: District Nürnberger Land
Measure: Extension and general renovation

General renovation of the entire school building, incl. auditorium, after school care facilities and catering kitchen, cafeteria, rooms for all day care, administration, teachers’ lounge and specialised rooms with adjoining rooms. Four classrooms were added to the building by adding another floor. During the building measures lessons took place in a container unit for 12 classes.

Trades and work phases:
  • Construction planning: WPH 1 – 9
    (general renovation from WPH 2)
  • Structural planning: WPH 1 – 6
    (general renovation from WPH 2)
  • Electrical engineering: WPH 1 – 9
    (general renovation from WPH 2)
  • Building services engineering: WPH 1 – 9
    (general renovation from WPH 2)
 
 
Gymnasium Pfarrkirchen (academic secondary school), Pfarrkirchen     mehr Info...

Contractor: Federal State Bavaria, public building authorities Passau
Measure: General renovation

The general renovation of the school building included the restructuring of the administration, the renovation of classrooms, bathrooms, other equipment rooms and the auditorium as well as the construction of a new entry building. Interim and temporary measures were integrated into the construction process to allow classes to go on during the construction works.

Trades and work phases:
  • Construction planning: WPH 6 – 8
  • Electrical engineering: WPH 5 – 8
  • Building services engineering: WPH 5 – 8
  • Safety and health coordination (SiGeKo)
Grundschule “Am Schwalbanger” (elementary school), Neuburg an der Donau     mehr Info...

Contractor: Neuburg an der Donau
Measure: General renovation and extension

General renovation of the elementary school, incl. the cafeteria with catering kitchen, the day nursery and the gym. For this measure as well as the extension of the building the lessons were relocated to container units.

Trades and work phases:
  • Building services engineering: WPH 2 – 8
Schulzentrum Perach (school center), Perach     mehr Info...

Contractor: Perach
Measure: Renovation of the energy efficiency and heating concept

Core renovation of the school from the 1960s with renovation of the energy efficiency of the building envelope according to EnEV. Additionally, a heating concept was developed according to which the school and neighboring buildings will be supplied with energy by a central wood chip power station in the future. Thanks to an extremely short construction period, the ongoing lessons remained largely unobstructed. The attempt was made to carry out the majority of the building measures during the vacations. The school received the District Energy Prize 2012 for its heating concept.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
Grundschule Malgersdorf (elementary school), Malgersdorf     mehr Info...

Contractor: Association of schools Malgersdorf
Measure: General renovation

The renovation of the 90-year-old main building of the Grundschule Malgersdorf was carried out while the building was in use. The measures were carried out on three floors and affected classrooms and adjoining rooms as well as the building fabric.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
Academies, colleges, universities     mehr Info...
Academy of Fine Arts Nuremberg     mehr Info...

Contractor: Academy of Fine Arts Nuremberg
Measure: New construction

The new construction is an elongated building with one floor and an extends the existing buildings. The new construction is divided into three separate houses and offers space for class-, training, seminar and office rooms. Communication rooms with a stage and a cinema are integrated as well.

Trades and work phases:
  • Electrical engineering: WPH 1 – 8

Photos: Roland Halbe, www.rolandhalbe.eu

University of Erlangen, departments of mathematics and information technology     mehr Info...

Contractor: Public building authorities Erlangen-Nuremberg
Measure: New construction

The new construction of the departments of mathematics and information technology was divided into the phases infrastructure provision and building. The infrastructure provision included the lighting, electrical connection, set-up of the telephone installation as well as the infrastructure with parking lots and street. Inside the building the work stations in the wings with 3 to 5 floors were supplied via wall ducts and a PV system was installed on the roof.

Trades and work phases:
  • Electrical engineering, material handling and media technology: WPH 2 – 8
Gyms     mehr Info...
Sports center Eggenfelden     mehr Info...

Contractor: Eggenfelden
Measure: Renovation of the energy efficiency and general renovation

General renovation of the three-court gym with its corresponding adjoining rooms and the attached one-court gym. Furthermore, the building from the 1970s was renovated to fulfill the current energy standards. In the course of these activities the facade was newly designed.

Trades and work phases:
  • Construction planning: WPH 1 – 9
  • Structural planning: WPH 1 – 6
  • Electrical engineering: WPH 1 – 9
  • Building services engineering: WPH 1 – 9
  • Outdoor installations: WPH 1 – 9

Photos: Stefan Schilling, www.stefan-schilling.de

Two-court gym Massing     mehr Info...

Contractor: Massing
Measure: New construction

New construction of a two-court gym with wood framing that was realized as glass/wood construction on one side to use the natural daylight. The gym is intended for school as well as recreational sport, has been built with one level underground and has a sprung floor heating. All day care facilities were integrated into the building that includes classrooms and care facilities as well as a cafeteria.

Trades and work phases:
  • Electrical engineering: WPH 1 – 8
  • Building services engineering: WPH 1 – 8
Clinics and hospitals     mehr Info...
Clinic Dritter Orden, Munich     mehr Info...

Contractor: Clinic Dritter Orden
Measure: Extension and structural improvement

General renovation and extension of the operative area by two additional operating theaters and a container unit with operating theaters for the ENT department. Extension of the children’s hospital. After the renovation measures the emergency care, central sterile supply department, intensive care and central laboratory were extended as well. During the planning process a structural improvement of the functional unit was agreed upon.

Trades and work phases:
  • Electrical engineering: WPH 1 – 3, 5 – 9
  • Material handling technology: WPH 1 – 3, 5 – 9
District hospital Friedberg     mehr Info...

Contractor: Kliniken an der Paar
Measure: New construction and partial renovation

The new construction and the partial renovation of the district hospital were realized in three phases. The new building houses an administration for the admission of patients, an emergency care unit, operating theaters with intensive care units, normal care units, various functional units with x-ray, CT, physical therapy, endoscopy, septic operating theater, trauma rooms, laboratory as well as an isolation unit.

Trades and work phases:
  • Electrical engineering: WPH 1 – 3, 5 – 9
  • Elevator technology: WPH 1 – 3, 5 – 9